久久免费国产精品一区二区,99在线看,亚洲国产天堂久久综合9999,国产日本在线播放,91欧美在线视频,久久久精品影院,亚洲成人99

中文
Projects
Chongqing High-tech Zone Yanshan Avenue Project

The total length of the project road is 25km. It is an urban trunk road dominated by freight traffic, with two-way eight-lane. The design speed is 60km/h. The construction and installation cost is about RMB 7.5 billion yuan. The project is located at the southern foot of Zhongliang Mountain, with complex topographic and geological conditions. The project crosses with 8 mountain-crossing arteries, 4 tracks, 4 railways and 5 reservoirs, so the project is very difficult.


Back

Main Work Undertaken

JSTI adopts full-professional BIM design, and proposes solutions to adapt to complex construction conditions and functional requirements.

  

Innovation Points

The Project has broken through the engineering technical difficulties related to underpass operation expressway ultra-shallow buried tunnel, single-hole 4-lane large-section unsymmetrical pressure mountain tunnel, 6-way intersection 20-ramp large interchange, bedding slope geology 50m high slope protection, etc.

 

Achievements

1. BIM technology application in the design phase of Phase I (Bid Section II) of the core area of the mountain freight corridor (Xintu Avenue) won the Municipal Excellent Achievement Award issued by China Municipal Engineering Association in 2022;

2. Design and application of BIM technology in large-scale interchange project under mountainous terrain conditions-Taking the Phase I Project (Bid Section I) of the core area of mountain freight channel (Xintu Avenue) as an example, won the third prize of design group of the municipal BIM technology application contest in 2023.